If you get Global News from Instagram or Facebook - that will be changing. Find out how you can still connect with us.
View image in full screen A contract crew working with NB Power works to restore power in Fredericton on Sunday, Sept. 17, 2023. THE CANADIAN PRESS/Stephen MacGillivray. GACNew Brunswick’s energy regulator has approved a Crown corporation’s application for a 500-Megawatt natural gas plant.
NB Power says it needs the project to meet a sharp increase in power demand by 2028.
The corporation has a 25-year contract with Missouri-based ProEnergy to set up 10 natural gas turbines in a rural area in the province’s southeast.
Get breaking National news
Get breaking Canada news delivered to your inbox as it happens so you won't miss a trending story. By providing your email address, you have read and agree to Global News' Terms and Conditions and Privacy Policy.NB Power says the proposed plant will help serve as a backstop when weather-dependent renewable power sources are not available.
It says the combustion turbines — which can switch to diesel when required — will be mixed in with batteries, wind and solar to create an overall cleaner grid.
- Too much English on Quebec government websites, says French-language commissioner
- Friday will reveal how Canada’s GDP reacted to the Iran war in March
- Multiple types of Chinese-made kids’ toys being recalled for safety risks
- 4 teens injured, 1 airlifted to trauma centre after rollover crash: Durham police
Nova Scotia’s energy operator has signed a 10-year agreement to purchase 100 Megawatts of power from the future plant.
The project still requires approval following an ongoing provincial environmental impact assessment.
Add Global News as a Preferred Source on Google to see more of our stories in your search results.
Journalistic standards Report an error © 2026 The Canadian Press